2 x 150 MW incl. dust removal-, desulphurisation- and denox- plant. Year of first commissioning: 1978 | operating hours: 160.000 h | still running
320 MW combined cycle gas turbine plant (GT: 55 MW | ST: 260 MW). Year of first commissioning: 1973 | operating hours: steam tubine 12.000 h | 2.000 starts-gas turbine 3500 h | 845 starts | still running as stand by power plant
100 MW power plant unit. Year of first commissioning: 1975 | operating hours: 180.000 h | stopped 30/8/98
2 x 5 MW oil-fired-power plants

AVAILABLE SECOND-HAND POWER STATIONS

DATA COLLATIO
of second-hand hard coal power stations


Legend 25 UNITS
EACH 100 MW
16 UNITS
EACH 210 MW
2 UNITS
EACH 500 MW
FIRST COMMISSIONING
OPERATION PERIOD
SHUT DOWN

TURBINE:
POWER (MW)
LIVE STEAM PRESSURE
LIVE STEAM TEMPERATURE
G ENERATOR:
RATED POWER
RATED VOLTAGE
GENERATOR TRANSFORMER:
RATED POWER
VOLTAGE RATIO

TAP CHANGER
YEAR BUILD
AUXILARY TRANSFORMER:
RATED POWER
VOLTAGE RATIO
1962 -1972
170 - 200.000
1993 - 1997

100
133 bar
530º C

125
10,5

125
10,5 / 240

± 9
1963 - 1990

16
10,5 / 6,3
1971 - 1975
150 - 170.000
1995 - 1999

210
127 bar
545º C

247
15,75

235
15,75 / 210 - 15,75 / 231

± 9
1970 - 1990

25 / 12,5 /12,5
15,75 / 6,3
1974 - 1976
150.00
1998

500
166 bar
530º C

588
20

2 x 310
20 / 398

± 9
1974 - 1975

25 / 12,5 /12,5
20 / 6,3 / 63

 

For further technical data: Get in touch with us!